LIST OF ATTEMPTED QUESTIONS AND ANSWERS
 Multiple Choice Multiple Answer
  Question 
Which of the following concepts must be understood for the achievement of quality?
  Correct Answer 
Quality of design , Quality of conformance , Purpose of product
  Your Answer 
Quality of conformance , Quality of design
 Multiple Choice Single Answer
  Question 
What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved?
  Correct Answer 
Network
  Your Answer 
Network
 Multiple Choice Multiple Answer
  Question 
Which of the following cases indicates change in physical characteristic?
  Correct Answer 
Turning , Grinding , Drilling
  Your Answer 
Turning , Grinding , Drilling
 Multiple Choice Single Answer
  Question 
What do you mean by the verification of object against predetermined standards of quality or quantity or both?
  Correct Answer 
Inspection
  Your Answer 
Quality assurance
 Multiple Choice Single Answer
  Question 
Any premise in which persons are employed for purpose of making any product/s is called
  Correct Answer 
Factory
  Your Answer 
Factory
 Select The Blank
  Question 
The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive
  Correct Answer 
Preventive Maintenance
  Your Answer 
Preventive Maintenance
 Select The Blank
  Question 
The ________ is the defect level for which lots are regarded as bad lots.
  Correct Answer 
Lot Tolerance Percentage Defective
  Your Answer 
Lot Tolerance Percentage Defective
 Multiple Choice Single Answer
  Question 
How non-critical activities are shown in the time chart during project scheduling?
  Correct Answer 
Thin lines
  Your Answer 
Thin lines
 Select The Blank
  Question 
An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service.
  Correct Answer 
Equipment history card
  Your Answer 
Equipment history card
 Multiple Choice Single Answer
  Question 
Who prepares the daily production report?
  Correct Answer 
Shop Supervisor
  Your Answer 
Shop Supervisor
 Select The Blank
  Question 
Work study is also called ________ study
  Correct Answer 
Time and Motion
  Your Answer 
Motion
 True/False
  Question 
Every network does not necessarily have a critical path.
  Correct Answer 
False
  Your Answer 
False
 Select The Blank
  Question 
Production Planning is a centralised activity which includes functions such as ________
  Correct Answer 
Scheduling
  Your Answer 
Scheduling
 Multiple Choice Single Answer
  Question 
Which method of critical path determination begins with the end event and moves backward to the start event of the project network?
  Correct Answer 
Backward pass computation
  Your Answer 
Backward pass computation
 True/False
  Question 
Scrap allowance is added to net requirement of material while ordering for material
  Correct Answer 
True
  Your Answer 
True
 True/False
  Question 
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
  Correct Answer 
True
  Your Answer 
True
 Multiple Choice Single Answer
  Question 
A good plant layout helps in
  Correct Answer 
Reducing handling costs
  Your Answer 
Reducing handling costs
 True/False
  Question 
It would not affect the project completion time if non-critical activities take little loner time than planned.
  Correct Answer 
True
  Your Answer 
True
 Select The Blank
  Question 
The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies.
  Correct Answer 
Reconditioning
  Your Answer 
Reconditioning
 True/False
  Question 
Flow process charts do record movements as well as visual pictures.
  Correct Answer 
False
  Your Answer 
False
 True/False
  Question 
Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand
  Correct Answer 
False
  Your Answer 
False
 Multiple Choice Single Answer
  Question 
What is the meaning of " Product features" according to J.M.Juran?
  Correct Answer 
Quality of design
  Your Answer 
Quality of design
 Multiple Choice Single Answer
  Question 
Technique which can help an organization to reduce inventory is called
  Correct Answer 
MRP
  Your Answer 
MRP
 Multiple Choice Multiple Answer
  Question 
Which of the following are examples of consumption of physical effort during recording for method study?
  Correct Answer 
Bending , Positioning , Unloading
  Your Answer 
Bending , Positioning , Drilling
 True/False
  Question 
Objective of Work Study is to improve Productivity
  Correct Answer 
True
  Your Answer 
True
 Multiple Choice Multiple Answer
  Question 
Which three of the following options can be used to reduce the duration of activity during project crashing?
  Correct Answer 
Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
  Your Answer 
Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
 Multiple Choice Single Answer
  Question 
Which is the next stage to the inspection based quality control in the historical development of quality management.
  Correct Answer 
Quality assurance
  Your Answer 
Quality assurance
 Match The Following
Question
Correct Answer
Your Answer
Bottom compartment of control board
Bunch of work orders arranged in a sequence in which they are to be processed.
Bunch of work orders arranged in a sequence in which they are to be processed.
Control board
Pictorial view of machine loading activity
Pictorial view of machine loading activity
Top compartment of control board
Work order of item currently being worked on the machine
Work order of item currently being worked on the machine
Middle compartment of control board
Work order of item to be processed next on the machine
Work order of item to be processed next on the machine
 Select The Blank
  Question 
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
  Correct Answer 
Condition monitoring
  Your Answer 
Condition monitoring
 Select The Blank
  Question 
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
  Correct Answer 
Overtime working
  Your Answer 
Overtime working
 Multiple Choice Multiple Answer
  Question 
Following are some of the Principles of Management advocated by F W Taylor
  Correct Answer 
Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen
  Your Answer 
Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen
 Multiple Choice Multiple Answer
  Question 
How the concept of float is helpful to planners?
  Correct Answer 
To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources
  Your Answer 
To decide priorities in allocation of resources , To minimize the requirement of resources
 Multiple Choice Single Answer
  Question 
The process of changing inputs into outputs thereby adding some value to entity can be defined as
  Correct Answer 
Operation
  Your Answer 
Operation
 Multiple Choice Single Answer
  Question 
Which kind of defect can be called as minor defect?
  Correct Answer 
Which does not reduce the usability of the product for its intended use
  Your Answer 
Which does not reduce the usability of the product for its intended use
 Select The Blank
  Question 
The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts.
  Correct Answer 
Tolerance
  Your Answer 
Tolerance
 True/False
  Question 
Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part.
  Correct Answer 
True
  Your Answer 
False
 Multiple Choice Single Answer
  Question 
Which element of a network represents a task which has got a definite beginning and definite end?
  Correct Answer 
Activity
  Your Answer 
Activity
 Multiple Choice Multiple Answer
  Question 
Following are the commonly used factors considered for evaluation of layout in factor analysis method
  Correct Answer 
Flow of material , Equipment utilization , Working condition
  Your Answer 
Flow of material , Equipment utilization , Working condition
 Select The Blank
  Question 
A good maintenance system is not a luxary but a ________.
  Correct Answer 
Necessity
  Your Answer 
Necessity
 Select The Blank
  Question 
The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product.
  Correct Answer 
Specifications
  Your Answer 
Standards
 Multiple Choice Multiple Answer
  Question 
Which features should be covered by the specifications of materials while defining the qualitative requirement?
  Correct Answer 
Material composition , Dimensions , Any heat treatment if required
  Your Answer 
Material composition , Dimensions , Any heat treatment if required
 Multiple Choice Single Answer
  Question 
The ratio of output to input of a production system is commonly known as
  Correct Answer 
Productivity
  Your Answer 
Productivity
 True/False
  Question 
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
  Correct Answer 
False
  Your Answer 
False
 Multiple Choice Single Answer
  Question 
Which portion of the perforated route sheet should be signed by the operator or supervisor?
  Correct Answer 
Lower portion
  Your Answer 
Lower portion
 True/False
  Question 
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
  Correct Answer 
True
  Your Answer 
True
 Match The Following
Question
Correct Answer
Your Answer
Scale model
Layout analysis
Modelling approach to layouts
Factor Analysis
Method to evaluate layouts
Technique for evolving and analysis of layouts
Minimization of production delays
Objective of good layout
Objective of good layout
Maximum visibility
Principles of good layout
Principles of good layout
 True/False
  Question 
Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning.
  Correct Answer 
False
  Your Answer 
True