Supply Chain Management - 20

LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question In performance scenario, in a simplistic manner provides the
continuous total productivity management cycle of :-
Correct Answer Measurement , Evaluation , Planning
Your Answer Measurement , Evaluation , Planning
True/False
Question The economic order quantity is the order quantity that minimizes
total cost.
Correct Answer True
Your Answer True
Select The Blank
Question The models that describe operational decisions are often very
________ in nature.
Correct Answer Specific
Your Answer Specific
Multiple Choice Multiple Answer
Question Which of the following are the modes of transport?
Correct Answer Rail , Ocean , Air
Your Answer Rail , Ocean , Air
Multiple Choice Multiple Answer
Question The strategic decision in supply chain includes :-
Correct Answer What products to produce , Which plants to produce them ,
Allocation of Suppliers to plants
Your Answer What products to produce , Which plants to produce them ,
Allocation of Suppliers to plants
Multiple Choice Multiple Answer
Question What are the major steps in cycle counting?
Correct Answer Cycle counting , Control group cycle counting , Random cycle
counting
Your Answer Cycle counting , Control group cycle counting , Random cycle
counting
Multiple Choice Multiple Answer
Question The consequence of longer lead time will often be :-
Correct Answer Less Dependability , Reduce Production Facility , Higher Levels
Of Inventory
Your Answer Less Dependability , Reduce Production Facility , Higher Levels
Of Inventory
Multiple Choice Single Answer
Question Delaying the component production until shortly before demand
is known, may imply producing in :-
Correct Answer Small batches
Your Answer Small batches
Match The Following
Question Correct Answer Your Answer
Planned order release When we need to release
the planned orders having
regard to lead time
required
What we will receive each
period as a result of
planned orders
Projected on hand What the inventory level
will be if we produce
according to plan above &
demand forecast is correct
What we will each period
as a receive of purchased
orders
Projected net requirement What we will need in each
period to avoid stock out
i.e. the orders that should
be placed in order to avoid
such stock outs
When we need to release
the planned orders having
regard to lead time
required
Planned order receipt What we will receive each
period as a result of
planned orders
What we will need in each
period to avoid stock out
i.e. the orders that should
be placed in order to avoid
such stock outs
Multiple Choice Single Answer
Question What was introduced by Toyoto to have a method of controlling
production in new environment?
Correct Answer Kanban
Your Answer Kanban
Select The Blank
Question All of the product, process & infrastructure changes ________
will have an impact on the knowledge & skills the employees will
need to posses.
Correct Answer Outlined
Your Answer Given
Multiple Choice Single Answer
Question Spares stationery, consumable etc. are what type of inventory
for the organization?
Correct Answer Common
Your Answer Common
Select The Blank
Question ________ demand is converted into order information and
passed down through the supply chain to trigger product release
to the customer.
Correct Answer End Consumer
Your Answer Market
True/False
Question A two bin system is not appropriate with many stock items.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question To provide an adequate support what will be need to do with
information system?
Correct Answer Major overhaul
Your Answer Major overhaul
Select The Blank
Question Suppliers are ________ to JIT business.
Correct Answer Crucial
Your Answer Important
Select The Blank
Question The value of m reflects the weight given to the current
observation in ________ the exponentially smoothed moving
average for the specified period.
Correct Answer Calculating
Your Answer Finalizing
Multiple Choice Single Answer
Question Order cost is derived from the number of order placed multiplied
by the cost of:-
Correct Answer Placing an order
Your Answer Placing an order
True/False
Question Another aspect of Toyoto production system was reduction of
setup time.
Correct Answer True
Your Answer True
True/False
Question If you use only Transport Kanban in Kanban process then it is
known as simple Kanban process.
Correct Answer True
Your Answer True
True/False
Question NFW means Net financial assets in the private sector.
Correct Answer False
Your Answer True
True/False
Question Regardless of how inventory movement is accounted for, it must
be done correctly if accurate inventory records are to be
achieved.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which of the following is the cost in the supply contract?
Correct Answer Researching & negotiating
Your Answer Researching & negotiating
True/False
Question Logistics covers 90% cost of manufacturing.
Correct Answer False
Your Answer True
Select The Blank
Question As compared to minimal cost strategy the level strategy is
________.
Correct Answer Cheaper
Your Answer Simple
Match The Following
Question Correct Answer Your Answer
Towill 1996 1996
Forrester 1960 1947
Amstel 1990 1960
Whiteoak 1994 1990
Multiple Choice Single Answer
Question The co-ordination between various players in the supply chain is
the key for the effective :-
Correct Answer Management
Your Answer Management
Multiple Choice Single Answer
Question The result of all the factors is that there is not a single integrated
plan for the :-
Correct Answer Organisation
Your Answer Organisation
Multiple Choice Multiple Answer
Question Industrial Re-engineering concepts encourage :-
Correct Answer Modular Organization of work , Multi-skilling , On the job training
procedures
Your Answer Modular Organization of work , Multi-skilling , On the job training
procedures
True/False
Question In industries where it is particularly difficult to match supply can
benefit the most from implementing a postpone system.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question In MRP II, the concentration is on planning of the manufacturing
resources like :-
Correct Answer People , Machines , Storage
Your Answer People , Machines , Storage
Select The Blank
Question BOM can have ________ levels.
Correct Answer Many
Your Answer Two
Multiple Choice Single Answer
Question Historically economic techniques/methods tend to have large
forecasting errors, for which term?
Correct Answer Medium
Your Answer Short
Multiple Choice Multiple Answer
Question Following are the functions of EDI software :-
Correct Answer Interfacing with VADS , Trading Partner Database , Encryption of
EDI Message
Your Answer Interfacing with VADS , Trading Partner Database , Encryption of
EDI Message
Multiple Choice Single Answer
Question The concept of unfilled customer order as a measurement is
known as :-
Correct Answer A backorder
Your Answer Reverse order
Multiple Choice Multiple Answer
Question The changes to be made in supply chain due to problem of
longer lead time is:-
Correct Answer Speed it up , Restructure it , Change co-ordination
Your Answer Speed it up , Restructure it , Change co-ordination
Multiple Choice Multiple Answer
Question The majority of companies said that using 3 PL services had
positive effect on :-
Correct Answer Logistic Cost , Customer satisfaction
Your Answer Logistic Cost , Customer satisfaction , Employee Morale
Select The Blank
Question The purpose of the analysis is to discern some relationship
between Y1 values observed so far in order to ________ us to
forecast future values of Y1.
Correct Answer Enable
Your Answer Enable
Multiple Choice Multiple Answer
Question EDI agreement Legal Aspects covers :-
Correct Answer Internet cyber law , Time that message will be retained ,
Procedure for settling any dispute
Your Answer Time that message will be retained , Procedure for settling any
dispute , Legal Jurisdiction for settling dispute
Select The Blank
Question In the MRP package referred in the example, the entry of
capacity data is to see if we are________ production capacity.
Correct Answer Exceeding
Your Answer Meeting
Select The Blank
Question The multi plant co-ordination is to coordinate the ________ plans
of several plants.
Correct Answer Production
Your Answer Supply chain
Multiple Choice Single Answer
Question The Combination of integrated & Non-integrated measures may
allow PLAYER in supply chain to assess :-
Correct Answer Chain as a whole
Your Answer Chain as a whole
Multiple Choice Single Answer
Question If a defective piece was found in Kanban then what happened to
production of specified quantity in Kanban?
Correct Answer Quantity was not met
Your Answer Quantity was not met
True/False
Question Defects per million opportunities(DPMO) is concept of Four
Sigma.
Correct Answer False
Your Answer True
True/False
Question The visual record process is only a sub-process in Japanese
Kanban Management system.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question In a traditional informational pipeline supply chain player always
received order information from :-
Correct Answer Consumer
Your Answer Wholesaler
Select The Blank
Question Exponential smoothing can be viewed as forecast
continually________ by the forecast error just made.
Correct Answer Updated
Your Answer Improved

Saturday, October 18, 2008

Supply Chain Management - 19

True/False
Question NFW means Net financial assets in the private sector.
Correct Answer False
Your Answer False
Select The Blank
Question The strength of postponement lies in its wide ________ as speed becomes
more important capability.
Correct Answer Applicability
Your Answer Applicability
Select The Blank
Question BOMs are structural ________ that changes relatively infrequently.
Correct Answer Information
Your Answer Details
Select The Blank
Question Customer order promised cycle time is gap between the purchase order
creation and ________.
Correct Answer Requested delivery date
Your Answer Goods received
True/False
Question There are no international EDI standards. The user organization require to
develop it for their operation only.
Correct Answer False
Your Answer True
Match The Following
Question Correct Answer Your Answer
Order Processing Material Follow-up Material procurement
Order Picking Material Collection Material Collection
Order Consolidation Material Follow-up and
Collection
Material Follow-up
True/False
Question Orders must be phased out in time so as to ensure that there is no stock out.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question The pitfalls in inventory management can be avoided by using :-
Correct Answer Agent Based management , Information System , Globalization
Your Answer Agent Based management , Information System , Globalization , Localization
True/False
Question Inventory Turns means turns over per year for inventory procurement.
Correct Answer True
Your Answer True
Match The Following
Question Correct Answer Your Answer
Analytical Solution Is the possibility of using
mathematical methods to
obtain exact information on
question of interest.
Is the tool for understanding
issues of organizational
decision making.
Modeling Is the process by which we try
to gain the understanding of
how the corresponding system
behaves.
Is the possibility of using
mathematical methods to
obtain exact information on
question of interest.
Simulation Is the tool for understanding
issues of organizational
decision making.
Is the process by which we try
to gain the understanding of
how the corresponding system
behaves.
System Is the facility or process of
interest.
Is the tool used test the impact
of strategic level decision have
on supply chain performance.
Select The Blank
Question The Function for EDI software is message tracking and ________.
Correct Answer Audit Trail
Your Answer Audit Trail
Multiple Choice Multiple Answer
Question The realignment of processing includes :-
Correct Answer Order taking , Purchasing , Manufacturing
Your Answer Order taking , Purchasing , Manufacturing , Distribution
True/False
Question The corporations production Kanban is the card which regulates the
suppliers production kanban.
Correct Answer False
Your Answer True
Select The Blank
Question The exponenti________y smoothed moving average takes into account All
of the previous observations.
Correct Answer All
Your Answer Majority
Select The Blank
Question Periodic stock checks to count the stock physically enable the store to feed
in ________ figures to reconcile physical stock against book stock.
Correct Answer Adjustment
Your Answer Adjustment
Multiple Choice Multiple Answer
Question The assumptions in the example of MPS are :-
Correct Answer Two employee hours per job , Initial Number of employee is ten , Initial
Inventory is Zero
Your Answer Two employee hours per job , Initial Number of employee is ten , Initial
Inventory is Zero , Planning Period is 6 weeks
Multiple Choice Single Answer
Question SCM is the management philosophy to deal with integrated material &
information flow, right from raw material to consumption of finished goods but
the focus is given to :-
Correct Answer End User
Your Answer End User
Multiple Choice Single Answer
Question Initially the candidates for outsourcing were companies that needed to
reduce their :-
Correct Answer Assets
Your Answer Non Core Activities
Select The Blank
Question The cheapest solution is to simply ________ backorders to built up over the
planning period.
Correct Answer Allow
Your Answer Disallow
Multiple Choice Multiple Answer
Question The MRP output consists of :-
Correct Answer Scheduled receipt , Projected net required , Planned order Release ,
Projected sales
Your Answer Scheduled receipt , Projected net required , Planned order Release ,
Projected sales
Multiple Choice Multiple Answer
Question The box jenkins method requires forecasters to :-
Correct Answer Use their experience , Use their expert judgment , Use their Knowledge
Your Answer To make judgments , Use their experience , Use their expert judgment , Use
their Knowledge
Multiple Choice Multiple Answer
Question What are the major steps in cycle counting?
Correct Answer Cycle counting , Control group cycle counting , Random cycle counting
Your Answer Cycle counting , Control group cycle counting , Random cycle counting ,
Physical inventory
Multiple Choice Single Answer
Question In order to avoid a stock in a specified period, the quantity required to be
ordered is :-
Correct Answer 135
Your Answer 150
Multiple Choice Single Answer
Question Which employees will have to learn to manage shorter deadline along with
order taking employees?
Correct Answer Purchasing
Your Answer Logistics
True/False
Question All movements throughout the factory is controlled by Kanbans, and since
the Kanbans specify item precisely, no defects can be tolerated.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question In the customization of highly customized product which step has most
significant impact?
Correct Answer Production
Your Answer Design
Multiple Choice Single Answer
Question In the Stage of Technological Development for IT enabled Supply Chain
following thing is very important :-
Correct Answer MRP-I, MRP-II, ERP
Your Answer MRP-I, MRP-II, ERP
True/False
Question The constant m is called smoothing constant in single exponentially
smoothing.
Correct Answer True
Your Answer True
Select The Blank
Question The retailers undertake Pareto Analysis routinely to ________ turnover of
item.
Correct Answer Compare
Your Answer Predict
Select The Blank
Question A further development of ________ performance measures is that a matrix
of indicators can be formulated to relate main process of Logistics to the
major long term goals.
Correct Answer Logistics
Your Answer Distribution
True/False
Question Direct cost increase can be caused by product or process redesign.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question By arranging raw material deliveries at the start of day for one day's
requirement, JIT has :
Correct Answer Reduced / eliminated inventory
Your Answer Reduced / eliminated inventory
Multiple Choice Single Answer
Question How does aggregate plan created by master production schedule become
extremely detailed plan?
Correct Answer MRP translates it
Your Answer MRP translates it
True/False
Question If you use only Transport Kanban in Kanban process then it is known as
simple Kanban process.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question The SCM key metrics should be closely aligned to the company's strategic
objectives. In this measurements usually covers :-
Correct Answer Internal Business , Training , Customer
Your Answer Internal Business , Training , Customer , EDBMS
Multiple Choice Multiple Answer
Question EDIFACT is :-
Correct Answer Standard in Europe in Mid 80's , Accepted by US(ANSI) to supersede X 12 ,
Promoted as world ADI Standard
Your Answer Standard in Europe in Mid 80's , Accepted by US(ANSI) to supersede X 12 ,
Promoted as world ADI Standard , Analog system
Select The Blank
Question The four key figures of logistics strategic environment are competition,
market served, technology and ________ satisfaction
Correct Answer Stake holder's
Your Answer Customer's
True/False
Question Total productivity appears the only relevant productivity measure for decision
making purpose.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Question The treasury equation refers to predict customer spending will look at the
factors like :-
Correct Answer Consumer Non Durable Spending , Unemployment Rate , Inflation Index
Your Answer Consumer Non Durable Spending , Unemployment Rate , Inflation Index ,
Availability of products
Multiple Choice Single Answer
Question The upper quartile answer of the experts for automatic rapid transport was
widespread by which year?
Correct Answer 1985
Your Answer 1980
Multiple Choice Single Answer
Question What is the technique in which, a body of experts are hired to arrive at
opinion about the future?
Correct Answer Delphi
Your Answer Delphi
Multiple Choice Single Answer
Question What adds to service cost in central heating installation company if a filter
has to drive to and obtain a minor part?
Correct Answer Queue at supplier end
Your Answer Delay in getting components
Multiple Choice Multiple Answer
Question The various basic logistics productivity ratios can be used to control
elements such as :-
Correct Answer Warehousing , Transportation , Customer Service
Your Answer Warehousing , Transportation , Customer Service , Procurement
Select The Blank
Question It is often important to conduct ________ analysis in MRP.
Correct Answer What-if
Your Answer What-if
Multiple Choice Single Answer
Question What can a company improve by being able to postpone the production in its
existing business?
Correct Answer Performance
Your Answer Profitability
Multiple Choice Multiple Answer
Question In performance scenario, in a simplistic manner provides the continuous total
productivity management cycle of :-
Correct Answer Measurement , Evaluation , Planning
Your Answer Measurement , Evaluation , Planning , Effectiveness
Multiple Choice Multiple Answer
Question In 1990, General Motor had approximately :-
Correct Answer 1770 suppliers , 31 Assemble parts , 30 million metric tonnes per day of
shipment
Your Answer 1770 suppliers , 31 Assemble parts , 30 million metric tonnes per day of
shipment , 10000 parts shipped per day

Supply Chain Management - 18

Multiple Choice Single Answer
Question In 1996, the purchase of logistics services by 3PL on behalf of
their client in billion dollars was :-
Correct Answer 25
Your Answer 25
Multiple Choice Single Answer
Question The data content & floors of stock record systems are needed by
which methods?
Correct Answer Just in time
Your Answer Master production schedule
Multiple Choice Single Answer
Question The alternative strategy to meet the increased demand will be to buy
from subcontractor if it would have been :-
Correct Answer At cheaper cost
Your Answer Faster Supplies
Multiple Choice Multiple Answer
Question In 1990, General Motor had approximately :-
Correct Answer 1770 suppliers , 31 Assemble parts , 30 million metric tonnes
per day of shipment
Your Answer 1770 suppliers , 31 Assemble parts , 10000 parts shipped per day
True/False
Question Total productivity appears the only relevant productivity measure
Page 6
SCM
for decision making purpose.
Correct Answer True
Your Answer False
Select The Blank
Question The models that describe operational decisions are often very
________ in nature.
Correct Answer Specific
Your Answer Complex
Match The Following
Question Correct Answer Your Answer
Expedition More frequent & flexible delivery may be required for realignment of
process More frequent & flexible delivery may not be required for realignment of
process
Purchasing More flexible & frequent purchasing operation need to be established
for realignment of process More flexible & frequent purchasing operation need to
be established for realignment of process
Manufacturing If the installation of the most expensive components is to be
delayed as much as possible, change in the sequence & timing of manufacturing
steps may be required for realignment of process If the installation of the most
expensive components is to be delayed as much as possible, change in the sequence
& timing of manufacturing steps may be required for realignment of process
Order taking Companies that used to collect customer orders on a monthly basis
will need to shorten the information collection cycle time for realignment of
process Companies that used to collect customer orders on a weekly basis will
need to improve the information collection cycle time for realignment of process
Select The Blank
Question Market sales data is the ________ for the whole supply chain.
Correct Answer Information catalyst
Your Answer Competitive Advantage
Multiple Choice Multiple Answer
Question Following results are possible only & only if organisation goes for
Supply chain Priorities:-
Correct Answer On Time Delivery , Reduce Inventory Cost , More Revenue
Your Answer On Time Delivery , Reduce Inventory Cost , More Revenue
Multiple Choice Multiple Answer
Question The Appraisal points for market information enriched strategy are :-
Correct Answer JIT Capacity Level , Number of Stock turns , Order
Amplification
Your Answer JIT Capacity Level , Number of Stock turns , Consumer Habit
fluctuation
Multiple Choice Single Answer
Question How the average inventory for the stock item is represented?
Correct Answer By 1/2 stock
Your Answer By 1/2 stock
Select The Blank
Question The real benefits of Kanban will not be ________ until the
auto-industry moves into a mixed production.
Correct Answer Realized
Your Answer Utilized
Multiple Choice Single Answer
Question The levels at which long term decisions are made is :-
Correct Answer Strategic
Your Answer Strategic
Page 7
SCM
True/False
Question A two bin system is not appropriate with many stock items.
Correct Answer True
Your Answer True
True/False
Question MRP typically takes into account the capacity consideration.
Correct Answer True
Your Answer False
True/False
Question ODETTE is not applicable for automobile industry.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question While still maintaining high service level, the objective of supply
chain manager for inventory is to :-
Correct Answer Decrease it
Your Answer Decrease it
Multiple Choice Single Answer
Question What is Supply Chain?
Correct Answer Network of Facility & Distribution
Your Answer Network of Intermediate and Finished products
Select The Blank
Question It is often important to conduct ________ analysis in MRP.
Correct Answer What-if
Your Answer What-if
Multiple Choice Single Answer
Question Different machines were clustered together to eliminate :
Correct Answer Transportation of item
Your Answer Movement of workers
Multiple Choice Single Answer
Question How many levels the supply chain management is divided into ?
Correct Answer Three
Your Answer Three
Multiple Choice Single Answer
Question In the supply chain , Material flows :-
Correct Answer Downstream
Your Answer Horizontally
Multiple Choice Single Answer
Question Marketing, Distribution, planning and Manufacturing along the supply
chain operate :-
Correct Answer Independently
Your Answer Concurrently
Match The Following
Question Correct Answer Your Answer
Analytical Solution Is the possibility of using mathematical methods to obtain
exact information on question of interest. Is the possibility of using
mathematical methods to obtain exact information on question of interest.
Modeling Is the process by which we try to gain the understanding of how the
corresponding system behaves. Is used to evaluate the impact of information
sharing and Co-Ordination.
Simulation Is the tool for understanding issues of organizational decision
making. Is the tool used test the impact of strategic level decision have on
supply chain performance.
System Is the facility or process of interest. Is the process by which we try to
Page 8
SCM
gain the understanding of how the corresponding system behaves.
Multiple Choice Single Answer
Question The supply chain management is compared by " Cooper and Ellram" with
:-
Correct Answer Relay Team
Your Answer Relay Team
Multiple Choice Multiple Answer
Question If we take chair figures from MPS as chair requirement and to meet
those requirements, the package will produced a detailed production plan for :-
Correct Answer Seats , Backs , Legs
Your Answer Seats , Backs , Legs
True/False
Question In order to meet the guarantee to customer for shipment of notebook
PC on same day as receipt of order, the company has to maintain significant
amount of inventory.
Correct Answer True
Your Answer True
Select The Blank
Question In re-order level approach average stock levels stay more or
________ the same and are Less responsive to change in demand.
Correct Answer Less
Your Answer Less
Multiple Choice Single Answer
Question The Data required for the IT application in the field of SCM is
mainly based on:-
Correct Answer Decision Making
Your Answer DBMS
Multiple Choice Single Answer
Question According to Womack & Jones (1996),Who is the Prospective of SCM?
Correct Answer Final Customer
Your Answer Final Customer
Multiple Choice Multiple Answer
Question The modeling approaches are :-
Correct Answer Network Design , Rough Cut Method , Simulation Based
Your Answer Network Design , Rough Cut Method , Simulation Based
Multiple Choice Single Answer
Question The result of all the factors is that there is not a single
integrated plan for the :-
Correct Answer Organisation
Your Answer Supply Chain Management
True/False
Question Postponement does guarantee win win situation under all circumstance
in spite of cost involved.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question The mechanism by which material and information flows through supply
chain, is known as :-
Correct Answer Pipeline
Your Answer Pipeline
Select The Blank
Question Indirect cost increases can be caused by changes in the ________ and
distribution process.
Correct Answer Production
Your Answer Production
Page 9
SCM
Multiple Choice Multiple Answer
Question Following are some of the tools for Supply Chain Measurement :-
Correct Answer Cash to cash cycle time , Supply Chain cycle Time , Inventory
Replenishment Cycle Time
Your Answer Supply Chain cycle Time , Inventory Replenishment Cycle Time ,
Training Cycle Time
Multiple Choice Single Answer
Question The cost of oversupply is high in case of highly customized end
products as it is difficult to find for them:-
Correct Answer The alternative uses
Your Answer The alternative buyers
True/False
Question The information enriched factories are, therefore, able to make an
informed decision at a much earlier point in the time than the factory at the end
of the traditional supply chain.
Correct Answer True
Your Answer True
Select The Blank
Question Customer order promised cycle time is gap between the purchase order
creation and ________.
Correct Answer Requested delivery date
Your Answer Requested delivery date
Multiple Choice Single Answer
Question What can a company improve by being able to postpone the production
in its existing business?
Correct Answer Performance
Your Answer Sales
Multiple Choice Single Answer
Question The Gap between purchase order creation date and requested delivery
date is known as :-
Correct Answer Customer Order promised cycle time
Your Answer Customer Order promised cycle time
Multiple Choice Multiple Answer
Question In MRP II, the concentration is on planning of the manufacturing
resources like :-
Correct Answer People , Machines , Storage
Your Answer People , Machines , Storage
True/False
Question The enriching the order decisions with market place information
enables the factory to be much more responsive, since less supply chain Filtering
is taking place.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The co-ordination between various players in the supply chain is the
key for the effective :-
Correct Answer Management
Your Answer Management
Select The Blank
Question The retailers undertake Pareto Analysis routinely to ________
turnover of item.
Correct Answer Compare
Your Answer Increase
Select The Blank
Question The integration will make each unit of organization understand how
the action will impact other parts of & enabling it to choose alternative that
________ the organization goal.
Correct Answer Optimize
Page 10
SCM
Your Answer Complete
Select The Blank
Question The strength of postponement lies in its wide ________ as speed
becomes more important capability.
Correct Answer Applicability
Your Answer Applicability